Skip to content
Forward Deployed

Forward Deployed
Lessons and contents
Learn

Enterprise use case and target architecture: validate and carry forward

Source
From the Staff AI System Design course
By
Sourav Banerjee
Last updated
8 Nov 2026

Report an issue

How the Twelve Stages Reach This Destination

The map is a preview. A role appearing here does not count as teaching or mastery of its curriculum module.

Stage Pressure that earns the next change What to locate in the target architecture
T18.2: Build the MVP Alice needs a saved draft from supplied text API, hosted-model adapter, trusted scope, Metadata DB/history
T18.3: Distributed Execution Long work outlives an interactive request or worker Durable jobs, Queue, Workers, epochs and uncertain-effect inspection
T18.4: Enterprise Knowledge Supplied text cannot answer from changing internal policy Document Ingestion, source versions, Search Index and authorised context
T18.5: Scale the Application One application instance or data path becomes a bottleneck Stateless replicas, shared authority and bounded immutable caches
T18.6: Handle Overload and Fair Scheduling One tenant consumes finite shared provider capacity Bounded admission/queues, fair scheduling and request/token/slot budgets
T18.7: Enterprise Security Enterprise identity, isolation and data handling become explicit Identity/Policy Service, current resource checks, audit and approved egress
T18.8: Reliability and Consistency Crashes, stale replicas and lost responses break naive retries Consistency by data class, durable operation evidence and recovery
T18.9: Production AI Quality and Releases A behaviour change regresses supplier outcomes Evaluation Service, immutable bundles, approval, canary and rollback
T18.10: Inference and GPU Infrastructure Serving cost, latency or data-path constraints need comparison Model Gateway, approved providers, optional self-hosted engine and GPU Pool
T18.11: Fine-Tuning and Model Customisation Stable behaviour misses justify a governed challenger Dataset versions, Fine-Tuning Jobs, checkpoints and Model Registry
T18.12: Global Multi-Region Platform Residency and regional recovery change placement and economics Eligible regional cells, replication, fencing, capacity and usage evidence
T18.13: Staff-Level Platform Architecture Several app teams duplicate risky integration work Versioned manifests, shared contracts, ownership, migration and total cost

Recall Before Starting T18.2

  1. What is the customer’s complete outcome? Alice gets a permitted current policy answer, prepares a supplier reply, and reopens its committed saved result.
  2. Why are drafting, grounded answering, and document preparation different paths? They need supplied text, current authorised evidence, and durable background progress respectively.
  3. Which four paths form the target? Customer requests, document ingestion, quality/model lifecycle, and platform/regional control.
  4. What must stay true as the system grows? Trusted current access, tenant boundaries, bounded capacity, approved releases/routes, and honest durable outcome reporting.
  5. Must you build every target component in T18.2? No. Build the smallest saved-draft path and use each later requirement to justify the next change.

Use the HTML map to locate a component without notes, trace Alice’s request aloud, and explain one blocked or uncertain outcome. Those orientation checks are unassessed. Production ownership is assessed by the individual stages’ deeper exit gates.

Continue to T18.2: Build the MVP, or open its Markdown guide. Return here when a stage adds a component and locate its role in the final request flow.

Source and Verification Record

This orientation synthesises the actual T18.2, T18.4, T18.6, T18.7, T18.8, T18.9, T18.10, T18.11, T18.12, and T18.13 artefacts. See the latest accepted architecture and ADR portfolio.

T18.1 does not change the accepted architecture or imply that the target system has been deployed.

Key Takeaways

  • Alice's complete outcome is a permitted current policy answer, a prepared supplier reply and a committed saved result she can reopen.
  • The first build is the smallest saved-draft path, not every target component. Each later pressure earns the next change, such as long work earning durable jobs and one tenant flooding shared capacity earning bounded admission and fair scheduling.
  • As the system grows, five things must stay true. They are trusted current access, tenant boundaries, bounded capacity, approved releases and routes, and honest durable outcome reporting.

Rate your confidence and keep notes on the module page.