For
Engineers preparing for Forward Deployed, solutions or applied-AI engineering interviews
Assumes
No specific technical prerequisite — these test reasoning, not components
Objectives
  • Structure an open-ended or business-judgement question in the first five minutes
  • Explain what you would do first, and why, when the data or scope is poor
How to use it
Before reading, spend five minutes sketching your own answer. Then read the guide and compare the structure, not just the conclusion.
Reading order
Sources
The references for every tab are in Interview Guide 3 → References.

Original material for this site

Interview Guide 1 · 11 min — The complete case in one document — no companion tabs are needed.

Scale a Prototype to Production

The prototype proved the answer is useful to a hundred forgiving users, and nothing about how it behaves for a hundred thousand who did not ask for it.

Scaling a prototype a thousandfold is not a bigger deployment of the same system. It is a different system that happens to share a prompt. This page is the day-before pack for this case, a standalone case with no group.

Source What it contributes here
#61 Question 17 in the OpenAI Applied decomposition question bank The prompt, the seventeen items to cover, the adoption follow-up and its nine answers, reproduced verbatim in sections 1, 13 and 12
Neighbour prompt E in the same bank, "AI Migration from Prototype to Production" Section 2: the notebook variant of the same question
Cost & Latency cram sheets and additions Sections 2, 4, 7 and 15: why demos die in production, Little's Law, prices, rate limits, batch discount
Production study guide (12_production_and_operations) Sections 7 and 8: retries, breakers, fallback, degradation, budgets, the 99.9% answer
Handbook Module 08 doc 1 and Module 10 doc 4 Sections 10 and 12: shadow, canary, pointer-flip rollback, override rate, week-4 retention
Handbook Module 06 doc 1 Section 7: identity, fair queuing
G07, G13, G14, G18, G20 and Standalone #100 Cross-linked by section instead of re-explained

The source has talking points for this prompt, not a worked design. Question 17 lists what to cover and one follow-up. Everything that turns that list into an architecture, a sizing walk and a rollout is own construction, built from the sources above. Every number is a stated assumption for the whiteboard, not a measurement.


1. Ask What "Successful" Meant Before Scaling It

The prompt, verbatim from the question bank:

"A prototype works for 100 users. The customer now wants to deploy it to 100,000 users."

"Works" is the word to attack first. A prototype is usually judged on a demo and a few enthusiastic users. That evidence says the idea is valuable. It says nothing about cost, tail latency, abuse, or the users who never volunteered. The bank's own list of biggest mistakes includes "Treating a prototype as a production system."

Ask before sizing anything. The assumed answers are own construction, stated aloud so the interviewer can correct them.

Question Assumed answer What it decides
What does the prototype do? An internal assistant: answers from company documents and calls two read-only tools RAG plus light tool use, not a free-form agent
Who are the 100,000? Employees of one enterprise, across departments and three regions SSO, departments as tenants, residency questions
How was "success" measured? Thumbs-up rate and a manager's impression from 100 volunteers No real eval set exists yet; build one
What must stay true at scale? Answers cite sources; no user sees a document they cannot open Permission-aware retrieval is a gate, not a feature
What latency is acceptable? First token under 2 s at p95; full answer under 10 s Streaming, queueing and routing budgets
Is there a budget? Yes, but nobody has priced it yet The sizing in section 4 is part of the answer
When, and how fast? Company-wide within a quarter A staged rollout by cohort, not a launch day

The weak answer draws autoscaling and a load balancer. It treats the jump as a compute problem. The strong answer says three things in the first two minutes. The evidence of success does not transfer. The bill scales with request shape, not with users. And adoption is a deliverable, not a side effect.

"A hundred volunteers proved the idea is useful. A hundred thousand employees will test everything the volunteers forgave: cost, the slow tail, permissions, abuse and whether anyone changes how they work."

2. Name What the Prototype Was Hiding

A prototype hides problems by construction, not by accident. The cost cram sheet names four things demos hide. They hide traffic shape: one user, a warm cache, clean data. They hide tail latency: p95 and p99, not the average. They hide usage expansion: longer questions and bigger uploads, so tokens grow faster than requests. And they hide governance cost: security review, audit logging, evaluation, human review and support.

The same sheet contrasts prototype and production on six axes, verbatim in the table's middle column.

Axis Prototype → production (cram sheet) What that means for #61 (own construction)
Dataset curated/static → large, messy, multi-tenant, churning The eval set built from demo questions is biased toward what already worked
Security mocked → OAuth/OIDC/SAML, RBAC/ABAC, permission filtering, audit A shared API key and an unfiltered index become a data-exposure incident
Load one user → concurrency, spikes, batch, retries Provider rate limits appear at the Monday 9 a.m. spike
Observability console logs → traces, token metrics, cost dashboards, alerts Nobody can say why a bad answer happened
Latency one happy path → tail latency, queueing, cold starts The demo's 3 s answer becomes a 12 s p95 under queueing
Cost small bill → budget ownership, allocation, anomaly detection, procurement Nobody owns the invoice until it arrives

Add three gaps the table does not name (own construction). Prompts drift, because the builder still edits the live prompt by hand. Provider quotas are sized for a pilot account. And the support model is a chat message to the one engineer who built it. At a thousand times the users, that engineer becomes the outage.

The bank has a neighbouring prompt with the same shape: "A team has a successful notebook-based AI prototype. How do you productionise it?" Its discussion list is verbatim: reproducibility, CI/CD (continuous integration and continuous delivery), evaluation gates, model and prompt versioning, secrets management, monitoring, cost controls, security, SLAs (service level agreements), rollback, ownership and support. Answer it with this page. The notebook variant adds one first step: turn the notebook into versioned, tested code before any of the rest applies.

3. State Requirements as Testable Constraints

A requirement that cannot fail a test is a wish. "Scalable" is a wish. "Sustains 20 requests a second at p95 first-token under 2 s" is a constraint. The split below is own construction.

The functional core does not change from the prototype. Answer questions from company documents with citations. Call the two read-only tools. Keep a short conversation history. What changes is everything around that core: identity, limits, fairness, failure handling, evaluation, rollout and support.

Constraint Stated so it can be tested (own construction)
Throughput 20 requests/s sustained at peak, 40 requests/s burst for 10 minutes
Latency First token under 2 s p95; full answer under 10 s p95; measured per stage
Availability 99.9% for the assistant's own service; a provider outage degrades, never errors
Isolation Zero answers citing a document the user cannot open, tested before every release
Fairness One department's burst cannot raise another's p95 by more than 20%
Cost Cost per daily active user tracked by department; monthly spend within the approved budget ±10%
Quality No regression against the production-derived eval set on any intent slice
Operability Every page has a runbook; rollback in under 5 minutes without a redeploy
Adoption Week-4 retention and task success reported per department cohort

Every new constraint needs an owner in the architecture (own construction).

Constraint Primary component(s)
Throughput and latency Gateway queue, model router, streaming, provider capacity
Availability Retry, circuit breaker, fallback provider, graceful degradation
Isolation SSO at the gateway, permission filter in retrieval, scoped cache keys
Fairness Per-user token buckets, weighted fair queue per department
Cost Budget meter before the call, routing, caching, batch path
Quality Eval gate in CI, sampled online evaluation
Operability Prompt registry with a live pointer, runbooks, on-call

4. Size the Thousandfold Jump From Users Down to Tokens

Say the arithmetic aloud, because it turns "scale" into three numbers the customer must approve: requests per second, tokens per minute and dollars per month. Every figure below is an assumption (own construction). The method is what gets scored.

Step Assumption Result
Licensed users 100,000 —
Daily active share 30% once adoption settles 30,000 daily active users
Requests per active user 8 a day 240,000 requests a day
Business-hours concentration 80% of traffic in 8 hours ≈ 6.7 requests/s during working hours
Peak 3× the working-hours average ≈ 20 requests/s
Input per request 6,000 tokens: 1,500 system and tools, 3,500 retrieved, 1,000 history 1.44B input tokens a day
Output per request 500 tokens 120M output tokens a day
Concurrency Little's Law: 20/s × 5 s average ≈ 100 requests in flight at peak
Peak token rate 20/s × 6,500 tokens ≈ 130,000 tokens/s ≈ 7.8M tokens/minute

Little's Law is concurrency = throughput × latency, from the cost additions. It turns latency work into capacity work. Halving average latency halves the in-flight slots to provision.

Now price it. The cost additions list current tiers: Claude Sonnet 5 at $2.00 input and $10.00 output per million tokens, and Claude Haiku 4.5 at $1.00 and $5.00 (checked Sep 2026 on Anthropic's pricing page). Prices change constantly, so state the mechanism and say "I'd check current pricing" for the digits.

Scenario (own construction) Daily cost Monthly
Prototype: 100 users × 8 requests, one mid-tier model ≈ $14 ≈ $400
Naive scale: 240,000 requests on one mid-tier model $2,880 input + $1,200 output = $4,080 ≈ $122,000
+ route 70% of requests to the small model ≈ $2,650 ≈ $80,000
+ cache the 1,500-token stable prefix (read price 10% of input; only the mid-tier 30% benefits, because Haiku 4.5 will not cache a prompt under 4,096 tokens) ≈ $2,460 ≈ $74,000
+ cap average output at 350 tokens ≈ $2,220 ≈ $67,000

Two points carry the table. First, the bill went up about 300 times, not 1,000 times, because only 30% of licensed users are active. Adoption is a cost variable. Second, the three cheapest levers cut the naive bill by nearly half without touching quality on the hard 30%. The cost additions' rule of thumb is that a real agent request can become 5–20 sub-requests. If the tools grow into an agent, multiply the call count before trusting any of this.

Then check the provider. 7.8M tokens a minute at peak must fit the account's tokens-per-minute and requests-per-minute limits, split by model after routing. Plan for twice the peak, because retries during an incident and the Monday spike stack on each other (own construction). That headroom is a procurement conversation, and it starts weeks before launch.

5. Walk Each Tenfold Step and Name What Breaks

Scale in tenfold steps, because each step breaks something different. A plan that jumps from 100 to 100,000 finds all of them on the same morning. The table is own construction, built from the cost incidents and the production guide.

Step What breaks first First signal Fix before the next step
100 → 1,000 Shared API key and no per-user identity; the demo eval set; prompt edited live; support is one engineer's inbox Complaints reach the builder directly; answers wrong on documents the demo never touched SSO and per-user identity; versioned prompts; structured logs and traces; first eval set from real logs
1,000 → 10,000 Provider 429s at peak; the bill becomes visible; queueing inflates p95; retrieval exposes documents across departments 429 rate; invoice; p95 rising while p50 stays flat; a permissions complaint Gateway with rate limits, retry, breaker and fallback; permission-filtered retrieval; routing and caching; budgets per department
10,000 → 100,000 Department bursts starve each other; provider capacity; multi-region and residency; eval cost; incident blast radius; adoption stalls One department's p95 degrades during another's peak; eval bill spikes; week-4 retention flat Weighted fair queue; capacity commitment and a warm fallback; sampled online eval; on-call and runbooks; cohort rollout with change management

Read the table left to right in the interview. I'd expect the prototype's weaknesses to show up in roughly this order: identity first, capacity second, fairness and organisation last. The fix for each step is cheap before that step and expensive during it.

Where next

Revise the concepts